Quality Control

Every machine undergoes our rigorous 7-step inspection process before export.

Initial Assessment
01

Initial Assessment

Complete visual and functional inspection upon acquisition. Document all existing conditions with photos and video.

Engine & Hydraulics
02

Engine & Hydraulics

Full diagnostic of engine performance, hydraulic system pressure tests, and fluid analysis to ensure reliability.

Structural Inspection
03

Structural Inspection

Check mast, kelly bar, rotary head, and chassis for cracks, wear, and alignment issues.

Electrical Systems
04

Electrical Systems

Test all electrical components, sensors, control panel functions, and safety interlock systems.

Load Testing
05

Load Testing

Perform operational load tests to verify torque output, drilling capacity, and winch performance.

Cosmetic Preparation
06

Cosmetic Preparation

Professional cleaning, touch-up painting, and preparation for shipping presentation.

Final Report & Documentation
07

Final Report & Documentation

Generate comprehensive inspection report with photos, videos, test results, and maintenance history.

Transparency You Can Trust

We provide full inspection reports, real photos, and video walkarounds for every machine. No surprises — what you see is what you get.

Request Sample Report